This is an automated archive made by the Lemmit Bot.

The original was posted on /r/budgetwithbuckets by /u/positive_lis on 2023-06-24 00:09:58+00:00.


Apologies if this has already been answered somewhere, but I’ve done my best to search for it and can’t find it.

The situation is this: I realize I’ve over-allocated funds to a category, and I need those funds to cover a different bucket. I transfer those funds from Bucket A back to Rain, and then use the funds to fill Bucket B, with the intention of refilling the funds taken from Bucket A at the end of the month when I get paid again.

However, now the layout shows that the full “goal” amount for Bucket A has already been filled (even though it was then taken away not as a transaction) and so it’s bar for the month shows up as green and complete, with no prompt to refill the missing amount.

Is there any way around this?